HOW TO PLUG & POUR
Serving Draught Beer Was Never This Easy
Install blade
Draught the perfect beer
Switch Kegs
Get the manual
Blade - Set it up
SETTING UP THE BLADE
A blade comes in two boxes: the machine and the dome. After unboxing the appliance, the Blade has to rest for 2 hours. Simply install the tap handle and tighten it on the side and plug in the appliance.
PRESS THE ORANGE BUTTON
Use a keg that has been precooled for at least 16 hours. Use your thumb to press the orange button at the bottom of the keg until you hear a ‘click’.
CONNECT THE KEG
Open the tap lid. Insert a pre-cooled keg into the appliance. Make sure that the keg’s tube is correctly inserted and aligned to the orange groove. Push the black part of the spout into the tap and close the tap lid. Remove the red cap.
PLACE THE DOME
Place the dome over the appliance to keep the keg cold.
SWITCH ON BLADE
Turn on the appliance by pressing the ON-OFF switch on the right.
LOCK THE KEG
Flick the switch down to lock the keg in the appliance. The indicator light should turn solid green.
CHECK THE TEMPERATURE
Use the gauge to make sure the beer has reached the right temperature before pouring. Make sure you pre-cool the kegs in a cold storage between 0-4°C at at least 16 hours before use.